Preferred Roadway Plan Station

Preferred Roadway Plan - Shared Use Paths

  • 34% of public vote (more than any other alternative)

  • Four-lane roadway

  • Travel lane widths are 11 feet

  • Shared use path width is 12 feet

  • Add landscape to swale

PALM BAY ROAD TO FLANAGAN AVENUE PREFERRED ROADWAY PLAN

Click On Image Below To See Enlarged Version

Preferred Roadway Plan_PalmB to Flan_202
  • Palm Bay Road – Vehicular and pedestrian safety improvements

  • Hield Road – Add exclusive eastbound left-turn lane to improve traffic operations

  • Norfolk Parkway – Two left-turn lanes and shared thru/right turn lane on eastbound approach  to improve traffic operations (currently in design by West Melbourne)

  • Carriage Gate Drive – Convert to a directional median opening to improve safety and traffic operations

  • Burdock Avenue/Eber Boulevard – Add second westbound left-turn lane and raised median along Eber Boulevard to improve safety and traffic operations

  • Enhanced pedestrian facilities to improve safety at each intersection

FLANAGAN AVENUE TO HELEN STREET PREFERRED ROADWAY PLAN

Click On Image Below To See Enlarged Version

Preferred Roadway Plan_Flan to Helen_202
  • Fell Road/Wingate Boulevard – Pedestrian/bicycle safety improvements

  • Milwaukee Avenue/Heritage Oaks Boulevard – Based on public comment, added exclusive westbound left-turn lane to improve traffic operations and safety

  • Henry Avenue – Added second westbound left-turn lane and provided access management improvements to facilitate better traffic operations and safety

  • Enhanced pedestrian facilities to improve safety at each intersection

TRAFFIC OPERATIONS AND COST SUMMARY

  • No Improvements: 4 of 6 intersections operate at LOS E/F in one peak hour

  • With Improvements: Only 1 intersection operates at LOS E in one peak hour

  • Travel time reductions between 9% and 28% during peak hours

  • Total right-of-way and construction cost = $13.5 million

PROVIDE YOUR FEEDBACK

We would like your feedback regarding the Minton Road Feasibility Study. Please fill out the form below to provide your input on the virtual public meeting format and provide any additional thoughts at the bottom of the form. Thank you for participating!